Monday, 3 November 2014

PTK Studio shoot - meeting with anne

After talking with anne last friday she asked us to work out some things that were not as clear as other points the mains ones being

How will the wall be broken down and look realistic ?
What is the size of the room and what will we need to build it ?
lighting tests and plans as thats big part of our shoot ?
Action plan / roata for build
How will the creative room look with out looking tacky ? get rid of pained wall and just use coloured plastic?  Replace it with a tv wall ?


Here is a list of the things we need to work out now / get done before the shoot

  • Finalise the hand book and print 4 copies ( director , 1 ad, continuity and spare ) 
  • get copyright and footage of past DFSA work for the tvs 
  • plan what we want to film on the boxes 
  • cast an actor ( £8 / hour ) 
  • get props / costume / decorations 
  • Make the boxes for creative world ? maybe get rid of them ( dont fit in with tvs , but then what makes the room so special ) 
  • get lots of tvs 
  • build schedule
  •  sound / edit schedule
  • write a list of technical resources needed 
  • write a list of materials needed for build ( what is budget for that ) 
  •   Coloured plastic on wall to give stained glass effect  ( test it ) ( all wall or just paint it ) 
  • Prison bar look with lights test 
  • wall of tvs maybe ? 
  • glide or dolly training ? 
  • Green screen / after effects testing 
  • work out how to break down wall , list of what is needed for it ? ( if punch through, test cardboard , polystyrene etc )  (  maybe make the wall look like it crumbling down  pull away  paper  to plaster board crumbling  starts to give up but sees light through and kicks it down) 
  • Clean up shooting schedule
  • re draw story boards/ plan creative world better 
  • action plan for build 
  • lighting tests 
  • size of room 
  • orange jumpsuit instead of straight jacket

No comments:

Post a Comment